Search models, users, collections, and posts

Trackside Oil loading

Print Profile(1)

All
A1 mini
P1S
P1P
X1
X1 Carbon
X1E
A1
H2D
H2D Pro
H2S
P2S
H2C
X2D
A2L

0.2mm layer, 2 walls, 15% infill
0.2mm layer, 2 walls, 15% infill
Designer
4.2 h
5 plates
3.5(2)

Open in Bambu Studio
Boost
53
176
2
0
111
35
Released 

Description

This is a trackside loading for Oil field and refinery.

 

Assembly Instructions

1. Put nozzles on the points of the tubes
2. Glue the top plate to the tubes
3. Put the legs in the Jig stand
4. Glue 3 7mm rods on the legs
5. Glue the tube assemby to the top of the rods
6. Put walkway on the legsthen glue it
 

Comment & Rating (2)

(0/1000)