Search models, users, collections, and posts

Flip target

Print Profile(1)

All
P1S
P1P
X1
X1 Carbon
X1E
A1
H2D
H2D Pro
H2S
P2S
H2C
X2D
A2L

0.2mm layer, 2 walls, 15% infill
0.2mm layer, 2 walls, 15% infill
Designer
12.7 h
9 plates
4.9(12)

Open in Bambu Studio
Boost
256
686
17
7
395
157
Released 

Description

Assembly:

1. Bolt together the side panels and side panel connectors using M6 or M5 bolts and nuts.

2. Get the washers, rod and the target.

3. Assemble as shown in the photo.

4. Hang the target assembly in between the side panels.

5. Put the top spacer on the side panels.

Comment & Rating (17)

(0/1000)