Search models, users, collections, and posts
Kindle Fire HD 8 (10th Gen) / 7 (2019) Recessed Wall Mount - For Home Automation
IP Report
Print Profile(2)

0.2mm layer, 2 walls, 15% infill
Designer
3.2 h
2 plates

0.2mm layer, 2 walls, 15% infill
Designer
3.5 h
2 plates
Open in Bambu Studio
Boost
9
36
2
1
59
15
Released
Description
I designed this simple tray and bezel for an integrated install into my wall. Used for home automation.
Print the tray face up with supports & sand the backside if needed. The bezel can be held on with 2 sided tape which will hold the tablet in place as well.
Pictured is the Fire 8 mount, but both files included.
Category: DIY
License
This user content is licensed under a
Creative Commons Attribution











Comment & Rating (2)