Search models, users, collections, and posts

680zz bearing windmill, 19mm broomstick windmill, handheld windmill

Print Profile(1)

All
P1S
P1P
X1
X1 Carbon
X1E

0.2mm layer, 2 walls, 15% infill
0.2mm layer, 2 walls, 15% infill
Designer
7.3 h
9 plates

Open in Bambu Studio
Boost
7
21
0
0
14
3
Released 

Description

Content has been automatically translated.
Show original

 

Non-printed components:

1, 608zz bearings, approximately 0.5 RMB each will suffice. Inexpensive ones may be noisy, while more expensive ones are unnecessary;

Alternatively, you can purchase official 608zz bearings from this link

2, 19mm outer diameter threaded stainless steel broom handle, approximately 1.5 RMB each, should be available for under 2 RMB. Purchase ones with pre-existing threads; avoid those requiring additional plastic components.

Assembly instructions:

1, Remove supports

 

 

2, Insert bearings into the windmill blades, ensuring correct orientation (alternating directions). Install the first windmill blade, as shown below:

 

 

3, Install the second windmill blade, minding the groove orientation

 

4, Install the broom handle, taking care not to cross-thread.

5, Install the base cover to prevent injury from the sharp end of the stainless steel tube. Complete

 

Thanks to Brent Peterson for the propeller customization generator

Comment & Rating (0)

(0/1000)