Search models, users, collections, and posts

Suspension Bridge Train Track (Compatible with IKEA, BRIO, Hape)

Print Profile(3)

All
A1 mini
P1S
P1P
X1
X1 Carbon
X1E
A1
H2D
H2D Pro
H2S
P2S
H2C
X2D
A2L

V2.5_Suspension Bridge_XL_★Recommended Configuration
V2.5_Suspension Bridge_XL_★Recommended Configuration
Designer
9.2 h
4 plates
4.9(92)

V2.0_Suspension Bridge_L
V2.0_Suspension Bridge_L
Designer
8.2 h
3 plates
5.0(9)

V1.0_Suspended Hand Bridge
V1.0_Suspended Hand Bridge
Designer
8.7 h
3 plates
4.7(7)

Open in Bambu Studio
Boost
1117
3193
137
155
2.1 k
880
Released 

Description

Content has been automatically translated.
Show original

Suspension Bridge Train Track:

  • A suspension bridge-shaped train track compatible with IKEA, BRIO, and Hape toy trains. This bridge is a replica of the Adventure Bay Bridge from the movie “PAW Patrol: The Movie.”

    For the animated version of the Adventure Bay Bridge, please visit: PAW Patrol Adventure Bay Bridge Track, Compatible with IKEA, BRIO, Hape from Ren Workshop - MakerWorld

  • The bridge is divided into three sections, which can be separated independently or glued together with superglue. The installation method can refer to the previous versions.

————————————————

2024.09.22 V2.0 Update:

  • Increased the size of the opening, now allowing larger trains to pass through.
  • The problem of the top of the upper pillar being loose has been solved.
  • Connecting buckles have been added between the three sections of the bridge. Now, no glue is needed to maintain a complete shape, and the tightness is suitable for easy assembly and disassembly.

   

  • Connecting pieces have been added, and the two ends can be directly spliced into a small bridge.

 

————————————————

2024.09.25 V2.5 Update:

  • The opening size has been further expanded, which should support most trains on the market.

    Added opening size test piece (located on plate 4), which can be used to test the size of the train before printing the bridge to avoid wasting filament and time.

  • The anti-slip sawtooth of the ramp has been optimized.
  • Some sharp corners have been optimized for child-friendliness.
  • A connecting piece storage space has been added to the base of the middle bridge pier to prevent the connecting pieces from being lost due to lack of storage.
  • Due to time constraints, this update has not been tested yet, but the key connection dimensions have not changed. If there are any problems, please feel free to leave feedback in the comments section. Thank you for your support!
  • Hope you enjoy!

Boost Me (for free)

Hope you enjoy!

Comment & Rating (137)

(0/1000)

License

This user content is licensed under a Standard Digital File License.

You shall not share, sub-license, sell, rent, host, transfer, or distribute in any way the digital or 3D printed versions of this object, nor any other derivative work of this object in its digital or physical format (including - but not limited to - remixes of this object, and hosting on other digital platforms). The objects may not be used without permission in any way whatsoever in which you charge money, or collect fees.