Holds two GRR-RIP blocks vertically on your wall neatly (french cleat and screws)
Print Instructions:
- 3 perimeters
- PETG
- Gyroid 15% infill
- main body vertical
- hanger T requires support (tree works fine)
Assembly:
- dry-fit first
- CA glue the two pieces together
- seam should be flush