Trackside Oil loading

Trackside Oil loading

Boost
4
6
0

Print Profile(1)

All
A1 mini
P1S
P1P
X1
X1 Carbon
X1E
A1

0.2mm layer, 2 walls, 15% infill
0.2mm layer, 2 walls, 15% infill
Designer
4.2 h
5 plates

Boost
4
6
0
0
9
0
Released

Description

This is a trackside loading for Oil field and refinery.

 

Assembly Instructions

1. Put nozzles on the points of the tubes
2. Glue the top plate to the tubes
3. Put the legs in the Jig stand
4. Glue 3 7mm rods on the legs
5. Glue the tube assemby to the top of the rods
6. Put walkway on the legsthen glue it
 

Comment & Rating (0)

Please fill in your opinion
(0/5000)

No more